LAKESIDE
APARTMENTS LIPNO
WHEN YOU COMBINE THE BEAUTY OF NATURE WITH AN INNOVATIVE APPROACH, THE RESULT IS RECREATIONAL LIVING WITH SOMETHING EXTRA—LAKESIDE APARTMENTS LIPNO.
LAKESIDE APARTMENTS LIPNO
THE LAKESIDE APARTMENTS LIPNO RECREATIONAL LIVING PROJECT IS BEING BUILT RIGHT ON THE BANKS OF THE LIPNO RESERVOIR, A PLACE LONG POPULAR AMONG WATER SPORTS ENTHUSIASTS AND NATURE LOVERS.
22
18
24 / 7
[ APARTMENTS ]
[ PARk. SPACES ]
[ RECEPTION ]
[ LAKESIDE APARTMENTS LIPNO ]
A NEW LEVEL
OF COMFORT
THE LAKESIDE APARTMENTS LIPNO PROJECT WILL OFFER 22 PRIVATE APARTMENTS AND 1 STUDIO WITH ENCHANTING VIEWS OF THE LAKE. THE INTERIOR OF EACH APARTMENT WILL BE UNIQUELY CONNECTED TO THE EXTERIOR AS WELL AS TO THE ELEMENT OF WATER.
With an emphasis on function, durability, and a high level of comfort, the Lakeside Apartments Lipno building will come with plenty of parking spaces as well as a wellness area. It will also be equipped with modern technologies that will make everything run smoothly. Heat pumps with 16 geothermal 150-meter deep wells provide environmentally friendly heating.
Owners will be able to take advantage of comprehensive management services, which will be especially welcomed by those who wish to rent out their apartment on an occasional basis. It’s therefore an attractive investment opportunity in the lovely Lipno area without all the worries that go along with renting property.
22
[ PRIVATE APARTMENTS ]
33–120 sq. m.
[ FLOOR AREAS ]
18
[ GARAGE PARKING SPACES ]
1
[ PRIVATE STUDIO ]
16
[ GEOTHERMAL HEAT PUMPS ]
VIEW THE PRICE LIST
+
[ LAKESIDE APARTMENTS LIPNO ]
DESIGNED
FOR
A CAREFREE LIFESTYLE

Financed by Česká Spořitelna, the Lakeside Apartments Lipno project is being built by the renowned Swietelsky construction company, which has managed to adhere to agreed upon prices and deadlines even in these turbulent times.
[ GALLERY ]
VIEW MORE PHOTOS
OF THE APARTMENTS
[ A MESSAGE FROM THE ARCHITECT ]
“Throughout the decision-making process, the main criteria were always the lifespan of the building, the minimization of operating costs, and no compromises on the soundproofing between the individual apartments.”
ARCHITECT OF THE LAKESIDE APARTMENTS LIPNO PROJECT
ING. PETR MUŽÍK
Construction News
  • December 2022
    Construction is complete and all of the apartments have received final approval. In January, we are expecting the wellness zone to be approved, after which everything will be ready and new owners will be able to move in.
  • October 2022
    Construction by the Lipno Reservoir is progressing as planned. We are working on the final touches so that the project can receive final approval in November.
  • July 2022
    Construction is continuing according to plan. The facade and the roof of the left building is finished and the insulation of the right building is being completed. All of the windows have been installed and the doors and plastering are also done. Tests of the boreholes have shown that their efficiency is greater than expected, which will have a positive impact on costs.
  • May 2022
    At the end of spring, the external water and sewerage systems were finished and the boreholes were connected to the heat pumps. We are in the process of completing the insulation of the building envelope and electrical wiring. Aluminum windows have been fitted and exterior blinds are being installed. In the interior, we are laying down underfloor heating, and in the exterior we are building the roof over the garage.
  • March 2022
    As spring approaches, we are in the process of bricking the partition walls in the apartments on the 1st floor and concreting the ceilings between the 2nd floor and the attic. At the same time, the grounds are being landscaped and the creation of the storm water draining system on the property is under way.
  • December 2021
    The ceilings on the 1st and 2nd floors of the wing closest to the lake are now finished. In the other wing, work is continuing on the verticale structures, concreting, and preparation for the reinforcement of the ceiling between the 1st and 2nd floors.
  • November 2021
    At the end of spring, the external water and sewerage systems were finished and the boreholes were connected to the heat pumps. We are in the process of completing the insulation of the building envelope and electrical wiring. Aluminum windows have been fitted and exterior blinds are being installed. In the interior, we are laying down underfloor heating, and in the exterior we are building the roof over the garage.
  • October 2021
    As spring approaches, we are in the process of bricking the partition walls in the apartments on the 1st floor and concreting the ceilings between the 2nd floor and the attic. At the same time, the grounds are being landscaped and the creation of the storm water draining system on the property is under way.
  • August 2021
    During the second half of the summer, work was done on the basement columns and walls. The focus now is on the reinforced concrete ceiling above the basement.
Contact Us
+(420) 257 328 281
info@lakesidelipno.cz

Na Perštýně 2
Praha 1, 110 00
Follow Us
EXCLUSIVE REPRESENTATION
info@svoboda-williams.com
svoboda-williams.com